In the last class, Fusun told us that our projects may be considered on the basis of how well developed our proposals are for a given project as opposed to full-fledged deliverables from the outset. I met with Luz today and as we scanned the textbook we found a section which detail this procedure. So the PDFs are attached in the following link:
enjoy,